Instructions
This gap analysis document provides a simple framework for evaluation the current status of a SUMS according to ISO24089:2023 standard.
The status column is marked by one of the following identifiers:
- V: Validated ; The associated item is compliant with the standard.
- P: Partial ; The associated item is partially compliant with the standard.
- M: Missing ; The associated item is NOT compliant with the standard.
- N/A: The associated item is not applicable.
The evidence shall be provided by the target user, while optional comment maybe added by the target user or the assessor.
Note: Due to the copyright restriction of ISO documents, the following gap assessment shall be used in combination with the ISO24089:2023 standard.
Part 1: Requirements
Clause 4: General
Requirement |
Status (V, P, M, N/A) |
Evidence |
Comments |
4.3.1 Governance |
|
|
|
4.3.2 Continuous improvment |
|
|
|
4.3.3 Information sharing |
|
|
|
4.3.4 Auditing |
|
|
|
4.3.5 Supporting processes |
|
|
|
Clause 5: Project level software update requirements
Requirement |
Status (V, P, M, N/A) |
Evidence |
Comments |
5.3.1 Project management |
|
|
|
5.3.2 Tailoring and rationale |
|
|
|
5.3.3 Interoperability |
|
|
|
Clause 6: Infrastructure design and development
Requirement |
Status (V, P, M, N/A) |
Evidence |
Comments |
6.3.x TBD |
|
|
|
Clause 7: Vehicle and vehicle systems design and development
Requirement |
Status (V, P, M, N/A) |
Evidence |
Comments |
7.3.x TBD |
|
|
|
Clause 8: Software update package development
Requirement |
Status (V, P, M, N/A) |
Evidence |
Comments |
8.3.x TBD |
|
|
|
Clause 9: Software update campaign operations
Requirement |
Status (V, P, M, N/A) |
Evidence |
Comments |
9.3.x TBD |
|
|
|
Part 2: Deliverables
Clause 4: General
Clause 5: Project level software update requirements
Clause 6: Infrastructure design and development
Clause 7: Vehicle and vehicle systems design and development
Clause 8: Software update package development
Clause 9: Software update campaign operations